Yes, but this is not an industry wide competition, but rather a layered one: high-end operational scenarios are adding computing power, cost sensitive scenarios are reducing computing power, and both forces exist simultaneously.
The high-end side is indeed upgrading.
The mainstream solution for 7kW AC charging piles is shifting from a single MCU to a heterogeneous architecture of "MCU+NPU".
The driving force is very specific: dynamic power allocation for multiple vehicles requires fast local scheduling, fault pre diagnosis requires running lightweight models at the pile end, and V2G and photovoltaic energy storage collaboration require real-time processing of grid instructions.
The cost of computing chips has significantly decreased in recent years, and only after the threshold disappeared did manufacturers have the motivation to pile up computing power.
However, the demand for computing power itself is also layered, and there is a significant difference in the requirements between foundation piles and overcharging piles. Not all piles require NPU.
The low-end side is taking the opposite path.
The cost sensitive market has seen the emergence of a "minimalist master control+gateway" solution: the master control only retains CP/CC detection and relay control, while the protocol stack, metering, and remote management are all handed over to the gateway.
Low cost RISC-V chips are sufficient, with a very low BOM pressure.
The real demand for a large number of communication charging stations is not about being more, but about being sufficient and affordable.
The boundary lies in the scene.
The computing power competition takes place in places that require real-time local decision-making - multi gun power allocation, V2G scheduling, optical storage collaboration, and fault pre diagnosis.
The computing power investment in these scenarios can be directly converted into operating revenue or reliability premium.
In the standard home charging and basic public pile scenarios, there is no buyer for excessive computing power, and minimalism and modularity are the rational choices.
Summary:
In 2026, the main control board of charging piles will enter the computing power competition, but there are boundaries.
The decision on computing power configuration is not about industry comparison, but whether the computing power on this board is serving a scenario that can make money or save money.
There is a scene, the competition continues; There is no scene, and computing power is just a cost burden.
The main control board of the communication charging pile produced by Xincheng Technology is of high quality and good price. Welcome to inquire and purchase!
Contact:SHEN ZHEN X-CHENG Technology Co.,Ltd
Phone:18025316892
Tel:0755-21010929
Email:shutao.chen@x-cheng.com
Address:Room B911, Zhantao Technology Building, Longhua District, Shenzhen