When inspecting a charging station control board, should we first check the circuit protection or the protocol adaptation library and vehicle compatibility table?

First, let's take a look at the circuit protection. Circuit protection is a 'veto item', while protocol adaptation library and vehicle compatibility table are 'availability items'. The bottom line is safety, but discussing compatibility later is meaningless.

Why look at circuit protection first:

  • Protection failure directly leads to pile burning, vehicle burning, and injury, and many of them are silent failures, with no errors reported by the app.

  • Protecting defects is difficult to remedy through OTA. Leakage protection circuit, isolation, relay capacity, and hardware overcurrent comparator are board level hardware issues that cannot be resolved by firmware flashing.

  • Poor protocol compatibility, unable to charge at most, poor experience, can be replaced with new stations, firmware upgrades, and compatibility tables; Protection failure has no second chance.

  • The new national standards and certifications prioritize safety, not the number of vehicle models covered.

What to watch for circuit protection acceptance:

  • Whether the leakage protection is B-type or A+6mA DC detection, and whether the hardware operates independently;

  • Is there a hardware comparator for overcurrent protection;

  • Whether the overvoltage and undervoltage, over temperature derating, grounding detection, and relay adhesion detection are locally closed-loop;

  • Are the strong and weak electrical isolation devices complete;

  • Whether the auxiliary power supply has wide temperature isolation and surge protection;

  • Is there any margin left in the capacity of relays/contactors;

  • Is there redundancy in sampling; Is the watchdog and reset reliable.

  • Action testing is also required: simulate leakage, overcurrent, overheating, PE disconnection, and contact adhesion to see if they disconnect and lock within the required time.

Looking at the protocol adaptation library and vehicle compatibility table again:

  • Verify whether the OCPP version and Profile meet the target market requirements;

  • Does the CP/PP state machine comply with national or target standards;

  • Does ISO 15118/PLC support on-demand; Which vehicles are covered by the vehicle compatibility table and how to rollback in abnormal scenarios; Whether the authorization, billing, and offline policies are complete;

  • Does OTA have signature and rollback.

  • This part determines whether it is useful or not, but it belongs to iterative optimization.

One sentence for acceptance sequence:

  • First, perform a security veto, and then score the functionality.

  • If the circuit protection is not sufficient, simply return it;

  • After the circuit protection is over, evaluate whether it can stably make money in the target scenario using the protocol library and compatibility table.

Summary in one sentence:

  • Let's first look at circuit protection because it determines whether it can be used safely; The protocol adaptation library and vehicle compatibility table determine whether it can be used effectively. Security is admission, compatibility is bonus.