欢迎光临~深圳市芯橙科技有限公司
语言选择: 中文版 ∷  英文版

NEWS

What changes should be made to the main control board of charging stations in the Middle East: Type 2/J1772, OCPP 2.0.1, MID/UL, RED safety?

Going global to the Middle East, the main control board is not simply "adding another version", but rather making interface trade-offs, protocol and local compliance increments. Type 2 is the main line, J1772 is only compatible; OCPP 2.0.1 should be used as the baseline; The MID meter determines the credibility of billing, but local authentication of the entire machine cannot be saved; RED is not a direct certificate from the Middle East, but wireless RF compliance cannot be avoided.

Interface: Type 2 required, J1772 does not require resource reinvestment

  • The public and communication scenarios in the Middle East are mainly based on Type 2, and the CC/PP sampling, resistance determination, and locking logic of the main control board should be designed according to Type 2.

  • J1772 only appears on some American or Korean cars and is compatible with adapters. It is not worth adding a separate set of hardware sampling and state machines for it.

Protocol: OCPP 2.0.1 Based on baseline planning, cannot stay at 1.6

  • Saudi Arabia and other markets have made the adaptation of OCPP 2.0.1 and local billing platforms a project entry requirement, and some projects have also listed ISO 15118-20 and V2G capabilities as mandatory thresholds.

  • The protocol stack of the main control board should have the ability of certificate management, intelligent charging configuration, local billing adaptation, and discharge state machine. The cost of upgrading from 1.6 in the later stage is much higher than designing according to 2.0.1 from the beginning.

Measurement: MID meters are the basis for billing, but whole machine certification is the admission

  • Public piles are charged based on electricity consumption, and MID certified meters provide a reliable starting point for measurement.

  • The main control board should be able to correctly read and lock meter data, ensuring that reporting and storage are not tampered with.

  • But the MID single table certificate does not mean compliance with the entire pile, and approval from Saudi Arabia SASO, UAE ESMA/ECAS, and local power agencies is still a hard threshold.

  • UL is not mandatory for admission in the Middle East and cannot replace local certification. It can only serve as a design reference.

Wireless: RED is an EU directive, but RF compliance is essential

  • The Middle East does not directly issue RED certificates, but there are real RF and spectrum requirements for 4G/Wi Fi/Bluetooth modules.

  • Saudi Arabia is regulated by CST for wireless model approval, while the United Arab Emirates is regulated by TDRA/TRA. RED test data can serve as a starting point for technical evidence, but cannot replace local approval.

  • The wireless part of the main control board should be prepared for testing according to RF compliance, and then overlaid with local model approval.

Two easily underestimated increments: environment and language

  • The high temperature sand and dust in the Middle East pose higher requirements for device temperature width, heat dissipation ducts, connector sealing, and protective coatings. Directly applying temperate design is prone to failure in visual inspection and aging stages.

  • Saudi Arabia and other markets also require Arabic language interfaces to cover diagnostic menus and fault codes. The firmware of the main control board should support Arabic word libraries and right to left interface rendering, which cannot be solved by adding a translation file.

Summary priority:

  • Interface locking Type 2, not designed for J1772 dispersion;

  • The protocol stack is based on OCPP 2.0.1, with reserved local billing and V2G capabilities;

  • Measurement ensures the reliability of MID meter data and provides output for SASO/ESMA machine audit;

  • Prepare evidence according to the RED framework for wireless, and then obtain local approval from CST or TDRA;

  • At the same time, fill in the wide temperature, dust-proof, and Arabic language interface.

  • UL is not a Middle Eastern passport, and RED is not a local certificate either. The real determinant of whether it can be implemented is local certification plus substantive compliance.

The main control board of the communication charging pile produced by Xincheng Technology is of high quality and good price. Welcome to inquire and purchase!